This image is part of the header. It represents a colourful wave

Wind Farm Friedersdorf

The Wind Suitability Area Friedersdorf (Märkisch-Oderland district) has huge potential. Currently, 22 wind turbines from a total of four project developers are planned or already under construction. Prokon is implementing four wind turbines with an installed capacity of 22 MW. The turbines from GE Vernova (General Electric) have a hub height of 161 meters and rotors with a diameter of 158 meters. As the wind farm is being built on a former battleground where the last tank battle took place in 1945, the area had to be cleared of munitions before construction began.

In addition to the key data of the wind farm, the sponsorship for one of the turbines by WEtell, a sustainable mobile phone provider, is intriguing. As an active member of Prokon, WEtell is committed not only to expanding renewable energy but also to making a significant contribution to the energy transition. This collaboration highlights the importance of collective efforts and sustainable partnerships to ensure a green and sustainable energy supply for the future.

The Wind Farm in Numbers

0

wind turbines installed

0

MW rated power each

Supplying around

0

households

Images of the construction and operation of the Friedersdorf Wind Farm
Images from the construction and operation of the Friedersdorf Wind Farm: Image 1
Images from the construction and operation of the Friedersdorf Wind Farm: Image 6
Images from the construction and operation of the Friedersdorf Wind Farm: Image 1
Images from the construction and operation of the Friedersdorf Wind Farm: Image 2

Questions about the Friedersdorf Wind Farm

Want to know more?

Social media





Language (Country)


Prokon eG 2024. All rights reserved.