This image is part of the header. It represents a colourful wave

Wind Farm Langenbach

In May 2023, the Langenbach Wind farm in Rhineland-Palatinate went online, making an important regional contribution to Germany's climate neutrality goal by 2045. The installed capacity of 11 MW can supply 6,600 households. The rotors have a diameter of 158 meters, and the two wind turbines have hub heights of 121 and 161 meters. Additionally, the Langenbach Wind farm will be the venue for our second Wind farm Festival in 2024.

The Wind Farm in Numbers

0

wind turbines installed

0 MW

rated power each

Supplying around

0

households

Pictures of the construction and operation of the Langenbach Wind Farm
Wind Farm Langenbach Image Slider: Image 1
Wind Farm Langenbach Image Slider: Image 5
Wind Farm Langenbach Image Slider: Image 1
Wind Farm Langenbach Image Slider: Image 2

Questions and Answers about the Langenbach Wind Farm

Want to know more?

Social media





Language (Country)


Prokon eG 2024. All rights reserved.