1. Successful operation of our wind farms

Successful operation of our wind farms

Wind is what drives us. In order to be able to feed as much clean energy as possible into the grid with our turbines, high technical availability is of the utmost importance. To achieve this, we ensure smooth operation of all Prokon wind farms with our own employees.

    Operation of Prokon wind farms

    Top values: 97% availability

    For the optimal performance of our wind turbines, medium-voltage transformer stations, medium-voltage transfer stations, and substations, we are operating day and night.

    We deliberately work independently of manufacturers in maintenance and service. Our five service centres throughout Germany are each located in close proximity to the Prokon wind farms. This allows our qualified service teams to quickly respond to disruptions in wind turbines and ensure an availability of over 97%.

      Our parks in numbers

      0 wind turbines

      operating in Germany

      0 MW power

      in operation in Germany

      0 wind turbines

      being supervised in Germany

      Wind farm operation from A to Z

      Hand in hand, our colleagues in various departments take care to ensure that our wind turbines function smoothly. Discover more about their diverse tasks.

        Progress and development

        Progress and further development

        We recognise the need for optimisation in our process flows and implement improvements in collaboration with the software products used. We continuously review and update the technical circumstances and legal requirements, such as demand-oriented night marking, critical infrastructure, redispatch, and safety-related specifications. Additionally, we develop solutions that consider all interfaces and process flows in the field of service & operation of wind turbines.

        Our Story

        With pride, we look back on a long history in the service and operation of wind turbines (SOW).


          1. 1995

            So it all began:

            Establishment of Prokon


          2. 2002

            First times

            • first own technical operational management

            • first service team with two technicians

            • own service base founded in Beeskow


          3. 2004

            Build Up Oil Service


          4. 2005

            Establishing our own warehouse, previously Northex commission warehouse


          5. 2007

            The first wind farms are taken over in service and maintenance.


          6. 2010

            We are getting bigger

            • Building large component department

            • Establishment of own rotor blade team

            • Base in Hohendodeleben


          7. 2011

            First large component team, first component exchange


          8. 2012

            We keep going

            • first gearbox repair

            • start of construction of Hall D

            • base Bruch Mühlbach-Miesau (RLP)


          9. 2014

            Additional bases, now also abroad

            • Base Bexbach (RLP)

            • Service Base Belchatow in Poland


          10. 2017

            Base Stendal


          11. 2021

            Establishment of Prokon Renewable Energy Service GmbH (Pros)


          12. 2022

            Takeover of SH Wind GmbH by Prokon

          Approximately 30 years of successful wind farm operation

          Warehouse near the wind farms

          Our service hubs and warehouses across Germany provide us with high flexibility and fast response times.

          Extensive technical expertise

          Over the years, we have accumulated specialist knowledge about 70 different types of turbines – and the number keeps growing!

          Everything from a single source

          … from major component maintenance to technical operations management, as well as electrical laboratory services and billing.

          Our expertise for your wind farm project

          With around 30 years of experience in servicing and maintaining wind turbines from all major manufacturers, we have access to a level of expertise that is unmatched in the industry. We do not keep this knowledge to ourselves. In Prokon Renewable Energy Service GmbH (Pros for short), we have consolidated our skills and offer them as a service to other wind farms.

          Exciting Facts

          wind turbine gearbox

          How long does it take to change a gearbox?

          Depending on the manufacturer, type of plant, and plant capacity, a gearbox replacement takes between 5 and 8 days.

          Climbing Wind Turbine

          How long does it take to climb a turbine?

          Depending on the height of the plant, climbing the WEA via the ladder in the tower takes 10 - 20 minutes. The new and taller plants are equipped with a climbing system (lift).

          Wind farm  Hohe Wuhne

          What is the Operational Lifespan of a Turbine?

          Basically, the operation of the facilities is calculated or designed for 20 years. Due to legal regulations, there is the possibility to apply for an extension of operation at some locations. Depending on the approval and economic viability, an extension of operation of between 5 and 15 years is possible.

          Join our team!

          Would you like to actively shape the energy transition? As a pioneer in wind power, we offer you various career opportunities in wind park operation!

          To your new job
          Teamfoto SBW und Pros
          More about us as an employer

          Prokon Services for a Greener Future